During my time at Arrival (March 2020–June 2021), I worked on establishing a new EMC facility for automotive component testing. The scope included a 10 m semi-anechoic chamber, control room, and supporting equipment and software for conducted emissions and immunity testing.
My contribution
I authored the Arrival EMC laboratory request for quotation (RFQ), deriving it from the work I had done developing the earlier JLR EMC facility RFQ. I sent the Arrival RFQ to multiple vendors. It set out the required chamber and control-room scope, test equipment and services, and expectations for software, installation, commissioning, maintenance, and support.
I worked with suppliers through tendering and oversaw construction and setup. MDL Technologies and ETS-Lindgren were contracted to build the Arrival EMC facilities. My role included translating the testing needs into a facility scope that suppliers could quote against and deliver.
Scope and later use
The RFQ records the requirements and expected commissioning work; it is not a commissioning or acceptance report. I have not included claims about measured performance or formal acceptance results here.
After Arrival, Fortescue Zero acquired the building and continued to use the same physical chamber. My later recommissioning and configuration work at Fortescue Zero was a separate phase from the original Arrival project.